Crouch End, London

Upon site survey we found small sections of linear movement to screed resulting in hair line cracks from side to side with blown tiles in-between. Also the tiles were very dirty.

We carefully chopped out damaged sections of tile, locally repaired the screed and replaced tiles with a super flexible cement based adhesive and grout.

Tiles re-laid with flexible cement based adhesive to original geometric pattern, grouted, diamond buffed and sealed.

Job Highlights

Linear movement to screed
Very dirty tiles
Chopped out damaged sections
Locally repaired screed
Tiles re-laid, buffed & sealed