Finsbury Park, London

Upon site survey we found multiple sections of blown screed and also sections where tiles were missing and had been filled with cement. This floor was in a sorry state. Client also requested to extend the tiling to where a store cupboard used to be.

We carefully uplifted each piece of the Victorian floor tiles and cleaned the backs set aside. New pieces required for completion were sourced from a salvage yard. The entire screed was removed, structural panels screwed into the joists, renovation screed laid and then finally a decoupling membrane.

Tiles re-laid with flexible cement based adhesive to original geometric pattern, grouted, diamond buffed and sealed.

Job Highlights

Sections of blown screed
Missing tiles
Victorian floor tiles uplifted and cleaned
Screed removed
Tiles re-laid, buffed & sealed